Charles Sturt University – Energy Performance Contract (EPC Stage 1)

people provide 24/7 engineering support

0

saving pa by upskilling employees to self-deliver specific tasks

£ 0 k

anticipated saving to client by increasing self-delivery of reactive work

0 %

m² covered in terminals 1-5 and the train station

0

// Challenge

highlights

// Solutions

Overview

Charles Sturt University (CSU) engaged Conservia to deliver an Energy Performance Contract (EPC) across its Bathurst and Wagga Wagga campuses, contributing to CSU’s recognition as Australia’s first carbon neutral university under the National Carbon Offset Standard (NCOS). Stage 1 focused on audit, needs analysis, measurement & verification (M&V) to quantify energy saving targets, optimisation of existing systems as well as design and installation of new energy and water conservation measures across 17 buildings, including libraries, administration offices, laboratories, and student accommodation.

// Challenge

Solution

Conservia implemented a broad range of Energy and Water Conservation Measures (ECMs and WCMs) to reduce energy consumption and enhance operational efficiency.

// Solutions

Key Measures:

Conservia has achieved and maintained a ~30% reduction in overall electricity consumption. This has been achieved by implementing a number of bespoke Building Optimisation Advisory solutions:

// Challenge

Results

Energy, Gas and Water Savings:

ResourceAnnual Savings% of Total
Savings
% Over
Guarantee
Electricity813,548 kWh/year14%3.6%
Natural Gas4,106 GJ/year30%93%
Water740 kL/year16%3.6%

Financial Outcome:

MetricValue
Project Cost~$1,100,000
Guaranteed Cost Savings~$157,108/year
Achieved Cost Savings~$176,831/year
Savings Over Guarantee$19,723 (12.6%)
Simple Payback Period7 years

Environmental Outcome: